Mabey Hire - national coverage. local solutions
the Mabey Group

 Manhole Box


   manhole box

The Manhole Box is designed for use in conjunction with the Standard JC40 Box and allows quick manhole construction using trenchbox installation techniques.

  • Maximum depth of excavation with two extension boxes fitted to the base box is 5.4m
  • Five Manhole Box lengths are available:
    2.5m, 3.0m, 3.5m, 4.0m and 4.5m
  • All types have 2.5m high base panels and 1.5m high extension panels
  • The range of Manhole Box widths allows installation of manhole rings up to 3.0m in diameter
  • 2.5m, 3.0m and 3.5m boxes use screw adjustable JC40 struts
  • 4.0m and 4.5m boxes use pin adjustable struts
tel: 01924 460 601  |  fax: 01924 457 932
Copyright © Mabey Hire Limited 2007  
tel: 01924 460 601  |  fax: 01924 457 932
Copyright © Mabey Hire Limited 2007